Pricing

Prices for electrical engineering studies

The exact cost is determined after assessing the object, questions, documents and the need for a site visit, measurements and laboratory work.

Documents for calculating the cost of an electrical engineering examination
Free

Initial consultation and letter for court

Telephone consultations of up to 15 minutes and informational letters for court are free. The letter is prepared within 1 day after sufficient materials are received.

Request a letter

What the price includes

  • study of the agreed materials;
  • inspection and photographic documentation, where provided for;
  • analysis of the technical questions posed;
  • preparation of a written result.

What affects the price

  • the number of objects and questions;
  • the extent of documentation;
  • the need for measurements and a further site visit;
  • urgency and laboratory work.
Documents online

Get an exact cost calculation

Attach the contract, design documentation, estimate, records and photographs, and briefly describe the purpose of your inquiry. If the form does not work, email zapros@elektrika.moscow.

How data is processed: Personal Data Processing Policy. Attach only the materials needed; where possible, conceal unnecessary data about other people.

Attachments: up to 10 files of up to 10 MB each, with a maximum combined size of 15 MB. If a file is rejected, the enquiry is not sent.

Indicative timeframes

  • Review of an expert report — at least 5 working days.
  • Specialist’s opinion — at least 10 working days.
  • Court-appointed examination — at least 16 working days.
  • Preparation of a document based on inspection findings — at least 5 working days after the inspection.

These timeframes apply to standard assignments and begin after the order has been agreed, the complete set of materials has been received and the agreed payment conditions have been met.

Additional tests, laboratory examinations and the involvement of other specialists may extend the timeframe. The exact timeframe and scope of work are recorded in the order before work begins.

Write to usDiscuss your task ↗