ELECTRICAL ENGINEERING STUDIESWiring / electrical panels / equipment
Inspection · measurements · conclusions

A fault.
Find the cause.
Substantiate the conclusion.

Determining technical condition and the causes of short circuits, overheating, melting and damage after water ingress. Specialist opinions, report reviews and materials for court.

Illustrative circuit diagram. Not connection instructions.
Before work begins

The condition of an electrical installation requires precise documentation.

Prepare diagrams, records, the design and a description of the fault. Agree on access and the necessary safety conditions before the inspection.

Choose questions for the expert ↗

Typical scenario

Circuit labels differ from the electrical design: checking handover documents

Suppose the circuit labels in a distribution board do not match the wiring diagram supplied after renovation. The contractor calls it a documentation issue, while the customer wants to know whether the installation itself also differs.

Explore the scenario →

Typical scenario

A motor overheats after its control equipment is replaced

If a motor starts overheating or tripping after control equipment is replaced, timing alone does not establish the new devices as the cause. The previous and actual configurations, operating conditions and sequence of interventions need to be reconstructed. Load information and motor condition should be considered alongside control-system records.

Explore the scenario →

Expert Andrei Viktorovichelectrical engineering studies
Moscow and the Moscow Regioninspection by prior arrangement
Court-appointed and out-of-court expert examinationsreports, reviews and materials for court
Documents onlinepreliminary study of materials
Main areas

What can be examined

All services →
Examples of tasks

Electrical engineering cases

Anonymized examination scenarios without information about specific participants or court decisions.

All cases →
Work result

What document can be provided

  • a specialist opinion;
  • an expert report pursuant to a court ruling;
  • a technical inspection record;
  • a defect list and photographic table;
  • a review of a previously prepared report;
  • a calculation of the cost of remedying defects;
  • an informational letter for court.
Important

This site covers electrical engineering studies, court-appointed and out-of-court expert examinations, specialist opinions and report reviews. Electrical installation work is not performed.

Documents online

Send documents for preliminary study

Attach the contract, design documentation, estimate, records and photographs, and briefly describe the purpose of your inquiry. If the form does not work, email zapros@elektrika.moscow.

How data is processed: Personal Data Processing Policy. Attach only the materials needed; where possible, conceal unnecessary data about other people.

Attachments: up to 10 files of up to 10 MB each, with a maximum combined size of 15 MB. If a file is rejected, the enquiry is not sent.

Write to usDiscuss your task ↗