Reference information

Questions and answers

Brief answers about enquiries, inspections, documents, costs and materials for court.

Distribution board and protective devices
Is this an electrician's repair service?

No. The website concerns electrical engineering investigations, court-appointed and out-of-court examinations, specialist opinions and report reviews. Electrical installation and repair work is not performed.

When is an on-site inspection needed?

An inspection is usually needed to record the actual condition, component locations, signs of overheating, damage or installation quality.

Can we start with documents and photographs?

Yes. You can submit materials using the form. A preliminary review will show whether they are sufficient and whether a site visit is needed.

Can you prepare a document for court?

Yes. Options include an informational letter, a specialist opinion, a review or a court-appointed examination after a court order has been issued.

Which questions should not be put to an expert?

The expert answers technical questions. Questions of guilt, application of the law and whether to grant a claim fall within the court's competence.

How is the price determined?

After reviewing the object, questions, documents and the need for a site visit, measurements and laboratory work.

What should I do after a short circuit?

Do not alter damaged components unless necessary for safety; preserve photographs, records and parts. Work on electrical installations must be performed by qualified personnel.

Further questions

Is an electrical testing laboratory always needed?

The need for special measurements and tests depends on the specific questions. The provider, methods and cost of that part are agreed separately; an initial inspection does not automatically verify every parameter.

Can an object be examined after repairs?

This depends on the remaining signs and materials. Report the work performed and provide photographs taken before repairs, records and retained components. Alterations to the object may limit the conclusions.

Can an examination be conducted without design documents?

Missing design documents do not always preclude an inspection. However, some questions about compliance with documentation and system characteristics may remain unanswerable without the necessary background data.

Who arranges access and power isolation?

The procedure is agreed before inspection, taking account of the object, authority and applicable requirements. Placing an order does not entitle the visitor to carry out hazardous actions or switching operations independently.

Can someone else pay?

Yes, under the public offer and Order Invoice terms. Payment does not confer a right to demand a predetermined conclusion and does not in itself make the payer the recipient of the result.

Can I receive paper documents?

Yes. The result, Order Invoice and acceptance certificate may be provided on paper and/or electronically by agreement. Electronic format is not mandatory.

How is a document checked against the register?

On a separate request accompanied by a complete copy, issuance and correspondence to the retained copy are checked. No public customer database is published; the response must not disclose other persons' data without grounds.

How long are submitted materials retained?

An enquiry without a contract and its attachments are retained for up to 90 days from the last substantive message or conversation. Contract materials are retained on the relevant grounds. Email copies are subject to the retention and deletion rules.

Does an enquiry subscribe me to advertising?

No. Subscription takes place on a separate page with separate checkboxes; an unsubscribe form is available separately. Unsubscribing does not prevent an enquiry or service order.

Documents online

Send documents for preliminary study

Attach the contract, design documentation, estimate, records and photographs, and briefly describe the purpose of your inquiry. If the form does not work, email zapros@elektrika.moscow.

How data is processed: Personal Data Processing Policy. Attach only the materials needed; where possible, conceal unnecessary data about other people.

Attachments: up to 10 files of up to 10 MB each, with a maximum combined size of 15 MB. If a file is rejected, the enquiry is not sent.

Write to usDiscuss your task ↗