Before signing the final completion record, it is important to check that sockets and lighting work and that the actual installation complies with the contract, design and estimate. Visible defects should preferably be documented before the contractor starts correcting them.
What to check
- the positions of sockets, switches and cable outlets;
- circuit and circuit breaker labels;
- the condition of terminals and visible connections;
- whether the installed equipment corresponds to the agreed materials;
- the availability of as-built documentation and measurement results.
Which materials to preserve
Preserve the contract, terms of reference, design, estimate, records, receipts for materials and correspondence. Take overall and close-up photographs showing both the component's location and the specific defect.
Possible questions for the specialist
- whether the work performed has defects;
- whether the work complies with the documentation;
- the actual extent of the work;
- which remedial work is required;
- the cost of restoration.
Do not open the electrical panel or take measurements yourself unless you have the required authorization and qualifications.