
After renovation, the electrical panel must correspond to the agreed diagram, actual circuits and installed devices. Checking is not limited to whether the lights switch on: documentation, labeling, completeness and accessible signs of installation quality must be assessed.
Which documents to request
- the design or single-line diagram;
- the estimate and list of installed equipment;
- the as-built diagram and circuit labels;
- measurement records, where provided for;
- records of completed work and concealed work.
What is usually compared
The number and purpose of circuits, protective device ratings, the presence of residual-current protection devices, labeling, the condition of visible connections, the equipment's correspondence with the estimate and the logic of load distribution.
What to document in a claim
Each defect should preferably be described separately and accompanied by an overall location photograph and a close-up. Identify the document that specified a different arrangement.
Which questions can be put to the specialist
- whether the panel complies with the design and estimate;
- whether there are visible installation defects;
- which additional measurements are required;
- which remedial work is required;
- the cost of corrections.
Inspection of internal panel components and electrical measurements must be performed by persons with the necessary qualifications and with protective measures observed.